1. Factory space requirements: 13.5 meters * 13.5 meters * 9 meters
2. Equipment power requirement: 70HP
3. Production capacity introduction: 9000KG/batch (weight of raw materials)
4. Staffing: 3 people (same as NK cooking staff)
5. Maintenance:
Clean the interior of the air conditioner*once a week and clean the radiator air inlet*once a week
Inspection and maintenance of koji turner screws*once a week Bearing fixed maintenance
The rotor and stator of the screw pump must be replaced once every 5 years
6. Peripheral consumption: Ice water consumes 10 degrees C*20 tons (cycle)
Salt water minus -5 degrees C*20 tons