Specialized projects

Mechanical system

 

 

 

Fermentation Tank Area


 

1. Factory site requirements: 30 meters * 10 meters * 10 meters high

2. Equipment power requirement: 30HP

3. Production capacity introduction: 120 tons in the early stage of fermentation and 720 tons in the later stage of fermentation.

4. Staffing: 1 person (same koji making staff)

5. Maintenance:

Air compressor maintenance, screw pump replacement consumables every 5 years

Platform fixed paint maintenance

6. Energy consumption: air consumption 10HP air compressor + pressure storage barrel

主圖.jpg

 

Call to action image

 

logo-footer.png

SHENG CHENG ENGINEERING CO., LTD
HORNG YUH MACHINERY AND IRONS FACTORY

 

SHENG CHENG ENGINEERING CO., LTD

NO.13,SHING YEH YE ROAD SHIN GUANG LEE DOOU NAN CHENG.YUN LIN HSIEN,TAIWAN
TEL:886-5-5970970
FAX:886-5-5967872

 

HORNG YUH MACHINERY AND IRONS FACTORY

NO. 13, XINGYE 1ST ST, DOUNAN TOWNSHIP,YUNLIN COUNTY, TAIWAN
TEL:886-5-5970970
FAX:886-5-5967872

 

Chemical Equipment

Steel Frame Manufacturing

Machinery Assembly

Soy Sauce Production Equipment Turnkey Solutions

Microbial Feed Equipment Turnkey Solutions

Automated Machine Welding Services

Food Fermentation Machinery

 

 

TOP